Thermal Power Plant Coal Washing Wastewater: Conventional Limits and a New CDFU-Based Process

2026-11-20 13:08:43
立即下载

Coal Washing Wastewater: A Critical Environmental Task for Power Plants

In the daily operation of thermal power plants, treating coal washing wastewater is a critical environmental task. During coal processing and combustion, coal cleaning, screening and dewatering generate large volumes of coal washing wastewater. This wastewater contains suspended solids (coal fines, mud), dissolved organic matter (phenols, benzene compounds), oils, heavy metal ions (lead, cadmium, mercury, etc.) and other inorganic salt pollutants. It features large flow, complex and fluctuating water quality, high suspended solids and oil content, making it difficult to treat.

The pollutants in coal washing wastewater not only degrade water quality but can also threaten the environment and ecosystems. High suspended-solids content easily clogs pipelines and wears out equipment; oily substances are hard to remove completely and can cause secondary pollution if handled improperly; heavy metal ions are highly toxic and endanger living organisms; and the sharp fluctuation of water quality places very high demands on the adaptability of the treatment process.

Limits of Conventional Treatment Processes

Conventional coal washing wastewater treatment at thermal power plants typically uses sedimentation, filtration, coagulation and flotation. While these processes can remove some suspended solids and oil, they have many drawbacks: treatment efficiency is low and effluent quality unstable, making it hard to meet discharge standards consistently; the process generates large amounts of oily sludge, making treatment expensive with a large footprint and heavy labor requirements for operation and maintenance; and with such frequently changing water quality, conventional processes have poor shock resistance and cannot cope effectively.

The New SINOKLE Process

To overcome these defects, SINOKLE has developed an innovative coal washing wastewater treatment process for thermal power plants, whose core equipment is a two-stage CDFU cyclonic dissolved-air flotation unit. Based mainly on a purely physical method and incorporating advanced patented technology, the process achieves efficient, stable and environmentally friendly wastewater treatment.

Coal washing wastewater treatment process flow
Figure 1: Process flow of coal washing wastewater treatment

The new process works as follows: the wastewater first flows into a collection basin for preliminary debris removal, where larger impurities are taken out. It then enters the two-stage CDFU cyclonic dissolved-air flotation unit for deep treatment. In the CDFU unit, high-pressure dissolved air water is injected into the wastewater, generating large numbers of microbubbles. Thanks to the unit's unique internal cyclonic structure, these bubbles fully contact the suspended solids, oils and other pollutants in the wastewater and carry them up to the water surface, thereby removing the pollutants. Finally, the treated water enters downstream treatment units for further polishing, ensuring it meets discharge standards for reuse or for downstream processes.

Two-stage CDFU unit on site
Figure 2: The two-stage CDFU unit on site

In technical terms, the process performs excellently: influent oil and suspended solids are each up to 1,000 mg/L, and after treatment the effluent oil and suspended solids are both reduced to 20 mg/L or less, effectively cutting pollutant loads.

Advantages over Conventional Processes

  • Strong shock resistance: adapts to complex and fluctuating water quality and keeps effluent stable;

  • High efficiency: the two-stage CDFU cyclonic dissolved-air flotation unit removes pollutants efficiently;

  • Short process flow: mainly physical, simplifying treatment steps and lowering costs;

  • Less oily sludge: reduces the difficulty and cost of subsequent sludge handling;

  • No chemicals: the whole process requires no chemical dosing, making it environmentally friendly;

  • Fully automated, enclosed operation: small footprint, lower labor and maintenance costs, easy operation and better management efficiency.

With these outstanding advantages, the SINOKLE coal washing wastewater treatment process for thermal power plants has broad application prospects, providing strong technical support for power plant environmental work and helping thermal power plants achieve sustainable development.

Mobile phone/Whatsapp

+86 18926412206

Email

marketing@sinokle.com

Address

Room 2301, Building 1B, Smart Home, Baolong Street, Longgang District, Shenzhen, China

Phone
E-mail
Map
QQ Service