New Advanced Wastewater Treatment Process
Conventional advanced treatment, such as a coagulation sedimentation tank plus an ozone oxidation tank, has many drawbacks. Treatment performance is unstable and cannot reliably meet Class 1A standards; equipment reliability and automation are low, so adaptability and shock resistance are poor when water quality fluctuates and system stability suffers; large doses of flocculant and other chemicals are needed, which raises costs and produces more sludge; ozone consumption reaches 100%, keeping operating costs high; open operation allows ozone to escape and cause secondary pollution, creating significant safety and environmental risk; and the flotation tank occupies a large area, takes a long time to build and install, and is strongly affected by weather and labour factors.

SINOKLE's new advanced treatment process uses the CDOF as the core unit, paired with the CDFU for pre-treatment. The biological effluent first flows into the CDFU, where part of the suspended solids and COD are effectively removed. CDFU uses ozone gas as its gas source, and the scum it produces is discharged to the scum tank. Water pre-treated by the CDFU enters the CDOF for advanced treatment. The CDOF unit also uses ozone gas as its gas source; through multiple catalytic oxidation it rapidly degrades COD in the water, making the effluent colourless and transparent while reliably meeting the standard, and the CDOF backwash water is also discharged to the scum tank.

Process flow diagram of advanced wastewater treatment
The new process offers clear advantages. In terms of flow and efficiency it is short and highly efficient with strong shock resistance, reliably bringing effluent within standard. Technically it holds several invention patents, achieves high COD degradation and good decolourisation, and requires only one half to one quarter of the ozone dose of a conventional process, greatly reducing energy consumption; CDOF's multiple catalytic oxidation accelerates the reaction to a retention time of under 15 minutes, and the skid-mounted design means the footprint is only one fifth of a conventional process. For O&M, the patented processes of CDFU and CDOF ensure stable, reliable treatment and convenient maintenance; fully automated enclosed pressure operation eliminates ozone leakage, ensuring safety and environmental protection; and the fully automated, digitalised operating mode supports remote monitoring, reducing labour requirements and O&M costs.